Step 5 – User Permission

In this step, Project team members are granted the rights to edit time sheet manually as shown below:

 

 

If “Manually time edit allowed” column is checked/clicked against a team member, then that team member will be allowed to edit the time sheet manually. If it is unchecked, then manual time edit for that team member will not be allowed.

Click ‘SAVE & NEXT’ to save the current user permission and move to the next step or click ‘SAVE & EXIT’ to save the current step and exit Project creation.